Tanzania (en_GB)

Watch jobs in this category

Title Location Sort descending Date
Reset
Reliability Coordinator - Maintenance
Reliability Coordinator - Maintenance Sunrise Dam Gold Mine, WA, AU, 6440 Maintenance
Sunrise Dam Gold Mine, WA, AU, 6440 23 Jan 2026
Site Mobilisation Support
Site Mobilisation Support Perth, WA, AU, 6000 Human Resources Support Services
Perth, WA, AU, 6000 21 Jan 2026
Senior Exploration Geologist
Senior Exploration Geologist Sunrise Dam Gold Mine, WA, AU, 6440 Exploration
Sunrise Dam Gold Mine, WA, AU, 6440 20 Jan 2026
Health and Safety Systems Specialist - Sunrise Dam
Health and Safety Systems Specialist - Sunrise Dam Sunrise Dam Gold Mine, WA, AU, 6440 HS Strategy & Governance
Sunrise Dam Gold Mine, WA, AU, 6440 20 Jan 2026
Manager Underground Mining
Manager Underground Mining Perth, WA, AU, 6000 Mining Technical Services
Perth, WA, AU, 6000 19 Jan 2026
Senior Specialist Asset Integrity
Senior Specialist Asset Integrity Tropicana Gold Mine, WA, AU, 6430 Asset Management
Tropicana Gold Mine, WA, AU, 6430 19 Jan 2026
Blaster/Painter Technician
Blaster/Painter Technician Tropicana Gold Mine, WA, AU, 6430 Service and Infrastructure
Tropicana Gold Mine, WA, AU, 6430 15 Jan 2026
Electrical Maintenance (UG)
Electrical Maintenance (UG) Tropicana Gold Mine, WA, AU, 6430 Trades
Tropicana Gold Mine, WA, AU, 6430 14 Jan 2026
Leading Hand Electrical Maintenance - 12 months Fixed Term
Leading Hand Electrical Maintenance - 12 months Fixed Term Tropicana Gold Mine, WA, AU, 6430 Trades
Tropicana Gold Mine, WA, AU, 6430 14 Jan 2026
Senior Processing Control Engineer
Senior Processing Control Engineer Sunrise Dam Gold Mine, WA, AU, 6440 Processing
Sunrise Dam Gold Mine, WA, AU, 6440 14 Jan 2026

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

 

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.