Tanzania (en_GB)

Watch jobs in this category

Search results for "". Page 1 of 1, Results 1 to 10 of 10
Title Sort descending Location Date
Reset
Technician: Mechanical Maintenance - Sunrise Dam AU 26 Dec 2024
Technician: Processing Plant
Technician: Processing Plant AU Technical & Project Support
AU 24 Dec 2024
Technician: Geology - Tropicana AU 24 Dec 2024
Manager: Open Pit Mining
Manager: Open Pit Mining AU Mine Operations
AU 23 Dec 2024
Superintendent: Social Performance & Risk
Superintendent: Social Performance & Risk AU Environmental Management
AU 23 Dec 2024
Technician: Geology - Tropicana - 12 Month Fixed Term AU 17 Dec 2024
Specialist: Site Mobilisation Support
Specialist: Site Mobilisation Support AU Human Resources Support Services
AU 15 Dec 2024
Senior Engineer: Short-Term Planning AU 12 Dec 2024
Specialist: SC Improvement & Governance
Specialist: SC Improvement & Governance AU SCM Strategy & Planning
AU 6 Dec 2024
Senior Manager: Mining
Senior Manager: Mining AU Mine Planning
AU 6 Dec 2024

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

 

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.