Australia

Title Sort ascending Location Date
Reset
Accounts Assistant
Accounts Assistant Tropicana Gold Mine, WA, AU, 6430 Finance Business Partnership
Tropicana Gold Mine, WA, AU, 6430 Nov 12, 2025
Data Analyst
Data Analyst Perth, WA, AU, 6000 Financial Planning & Analysis
Perth, WA, AU, 6000 Nov 17, 2025
Day Operator Processing - E O I AU Oct 31, 2025
Electrical Maintenance Planner - Sunrise Dam
Electrical Maintenance Planner - Sunrise Dam Sunrise Dam Gold Mine, WA, AU, 6440 Maintenance
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 7, 2025
Exploration Geologist
Exploration Geologist Tropicana Gold Mine, WA, AU, 6430 Exploration
Tropicana Gold Mine, WA, AU, 6430 Nov 10, 2025
Maintenance Compliance Coordinator
Maintenance Compliance Coordinator Sunrise Dam Gold Mine, WA, AU, 6440 Asset Management
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 13, 2025
Mine Production Engineer
Mine Production Engineer Sunrise Dam Gold Mine, WA, AU, 6440 Mining Technical Services
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 3, 2025
Reliability Technician
Reliability Technician Tropicana Gold Mine, WA, AU, 6430 Maintenance
Tropicana Gold Mine, WA, AU, 6430 Nov 6, 2025
Senior Reliability Engineer
Senior Reliability Engineer Sunrise Dam Gold Mine, WA, AU, 6440 Asset Management
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 20, 2025
Senior Safety Advisor
Senior Safety Advisor Sunrise Dam Gold Mine, WA, AU, 6440 HS Strategy & Governance
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 13, 2025
Senior Technician - Geological Services
Senior Technician - Geological Services Sunrise Dam Gold Mine, WA, AU, 6440 Exploration
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 5, 2025
Senior Technician Electrical Maintenance
Senior Technician Electrical Maintenance Tropicana Gold Mine, WA, AU, 6430 Trades
Tropicana Gold Mine, WA, AU, 6430 Nov 21, 2025
Superintendent Resource Evaluation
Superintendent Resource Evaluation Perth, WA, AU, 6000 Geology
Perth, WA, AU, 6000 Nov 11, 2025
Supervisor Administration
Supervisor Administration Perth, WA, AU, 6000 Administration Services
Perth, WA, AU, 6000 Nov 10, 2025
Surface Exploration Geologist
Surface Exploration Geologist Sunrise Dam Gold Mine, WA, AU, 6440 Exploration
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 10, 2025
Talent & Development Specialist
Talent & Development Specialist Perth, WA, AU, 6000 Culture & Capability
Perth, WA, AU, 6000 Nov 10, 2025
Technician Belt Splicer
Technician Belt Splicer Tropicana Gold Mine, WA, AU, 6430 Maintenance
Tropicana Gold Mine, WA, AU, 6430 Nov 13, 2025
Technician Electrical Maintenance
Technician Electrical Maintenance Tropicana Gold Mine, WA, AU, 6430 Trades
Tropicana Gold Mine, WA, AU, 6430 Nov 4, 2025
Technician Geology AU Nov 18, 2025
Technician Geology
Technician Geology Sunrise Dam Gold Mine, WA, AU, 6440 Geology
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 21, 2025
Technician Mechanical Maintenance
Technician Mechanical Maintenance Sunrise Dam Gold Mine, WA, AU, 6440 Trades
Sunrise Dam Gold Mine, WA, AU, 6440 Nov 19, 2025

AUSTRALIA

Australia hosts two of our operations – Sunrise Dam and Tropicana, both in the north-eastern goldfields in the state of Western Australia. Sunrise Dam is wholly owned, and includes our 70% interest in the Butcher Well project. We have a 70% holding in and manage Tropicana. Regis Resources Ltd holds the balance of 30% which it acquired from IGO Ltd on 31 March 2021.

AUSTRALIA

Australia hosts two of our operations – Sunrise Dam and Tropicana, both in the north-eastern goldfields in the state of Western Australia. Sunrise Dam is wholly owned, and includes our 70% interest in the Butcher Well project. We have a 70% holding in and manage Tropicana. Regis Resources Ltd holds the balance of 30% which it acquired from IGO Ltd on 31 March 2021.

Sunrise Dam

Sunrise Dam is an underground and open pit operation located 220km northeast of Kalgoorlie and 55km south of Laverton.

Overview and Locality

Underground mining, carried out by Barminco under an alliance contract, is now the primary source of ore, following the cessation of mining in the open pit in 2014. The underground mine produces approximately 2.7Mt of ore annually, which is supplemented by low-grade stockpiles generated during open cut mining to fill the processing plant.

Ore from the Golden Delicious open pit, 12 km from the processing plant, will contribute approximately 1Mt of ore annually for several years to displace some of the stockpiled material from mill feed. Surface infrastructure in place includes the site’s gas-fired power station, sealed airstrip, accommodation village, Central Tailings Discharge facility and workshops

The 4.1 Mtpa processing plant comprises conventional gravity and CIL circuits and a flotation/fine grind circuit. A major multi-year underground exploration programme underway at the site has identified extensions to known mineralisation and several significant new ore zones.

 

A Brief History

Open pit production began in 1997 and the main pit was completed at a final depth of 500m below surface in 2014. Underground mining started in 2003 with a number of different mining methods being applied, depending on the style of mineralisation and grade of the geological domain.

Installation of a new fine grind and flotation circuit was completed in the second half of 2018. In 2021, mining commenced at the Golden Delicious satellite pit using open cut mining methods. A new higher-grade and shallower orebody, Frankie, was accessed by year-end 2021

Overview and Locality

Underground mining, carried out by Barminco under an alliance contract, is now the primary source of ore, following the cessation of mining in the open pit in 2014. The underground mine produces approximately 2.7Mt of ore annually, which is supplemented by low-grade stockpiles generated during open cut mining to fill the processing plant.

Ore from the Golden Delicious open pit, 12 km from the processing plant, will contribute approximately 1Mt of ore annually for several years to displace some of the stockpiled material from mill feed. Surface infrastructure in place includes the site’s gas-fired power station, sealed airstrip, accommodation village, Central Tailings Discharge facility and workshops

The 4.1 Mtpa processing plant comprises conventional gravity and CIL circuits and a flotation/fine grind circuit. A major multi-year underground exploration programme underway at the site has identified extensions to known mineralisation and several significant new ore zones.

A Brief History

Open pit production began in 1997 and the main pit was completed at a final depth of 500m below surface in 2014. Underground mining started in 2003 with a number of different mining methods being applied, depending on the style of mineralisation and grade of the geological domain.

Installation of a new fine grind and flotation circuit was completed in the second half of 2018. In 2021, mining commenced at the Golden Delicious satellite pit using open cut mining methods. A new higher-grade and shallower orebody, Frankie, was accessed by year-end 2021

Tropicana

Tropicana comprises a series of open pits and an underground mine located 200km east of Sunrise Dam and 330km east-northeast of Kalgoorlie in Western Australia.

Overview and Locality

Tropicana is a joint venture between AngloGold Ashanti Australia Ltd (70%), which manages the operation, and Regis Resources Ltd (30%).

Open pit and underground mining is carried out by Macmahon under an alliance contract. Open pit mining uses conventional drill and blast and load and haul methods, while underground mining uses jumbo development and mechanised open stoping. Since start-up, ore has been sourced from the Tropicana, Havana, Havana South and Boston Shaker pits. From 2021-2023 the Boston Shaker pit will be the main source of open cut ore while a major cutback of the Havana pit is carried out. Open pit material will be supplemented by approximately 1.2 Mtpa of ore mined from the Boston Shaker underground mine, and stockpiles.

The Tropicana processing plant has achieved a throughput capacity of between 8-9 Mtpa following several upgrades, including the installation of a second ball mill. The processing plant comprises a three-stage crushing circuit, inclusive of energy-efficient high-pressure grinding rolls, followed by conventional ball mill grinding and CIL recovery. Tropicana’s infrastructure includes a gas-fired power station, sealed airstrip, workshops, two borefields, a tailings facility and a modern village complex.

 

Overview and Locality

Tropicana is a joint venture between AngloGold Ashanti Australia Ltd (70%), which manages the operation, and Regis Resources Ltd (30%).

Open pit and underground mining is carried out by Macmahon under an alliance contract. Open pit mining uses conventional drill and blast and load and haul methods, while underground mining uses jumbo development and mechanised open stoping. Since start-up, ore has been sourced from the Tropicana, Havana, Havana South and Boston Shaker pits. From 2021-2023 the Boston Shaker pit will be the main source of open cut ore while a major cutback of the Havana pit is carried out. Open pit material will be supplemented by approximately 1.2 Mtpa of ore mined from the Boston Shaker underground mine, and stockpiles.

The Tropicana processing plant has achieved a throughput capacity of between 8-9 Mtpa following several upgrades, including the installation of a second ball mill. The processing plant comprises a three-stage crushing circuit, inclusive of energy-efficient high-pressure grinding rolls, followed by conventional ball mill grinding and CIL recovery. Tropicana’s infrastructure includes a gas-fired power station, sealed airstrip, workshops, two borefields, a tailings facility and a modern village complex.

A Brief History

Open pit mining began during 2012 with first gold production occurring during September 2013. Underground mining began in 2019 at Boston Shaker after a positive feasibility study.

Tropicana reached the 3Moz produced milestone during the first quarter of 2020. First stoping in the Boston Shaker underground mine occurred in June 2020 and the mine achieved commercial production in September 2020. On 22 April 2021, Regis Resources acquired the 30% stake in Tropicana from IGO.