Tanzania

Watch jobs in this category

Title Location Date Sort descending
Reset
Specialist Digital Technology
Specialist Digital Technology Johannesburg, ZA, 2198 SCM Strategy & Planning
Johannesburg, ZA, 2198 Dec 5, 2025
Director, Finance Business Partnering
Director, Finance Business Partnering Johannesburg, ZA, 2198 Controllership
Johannesburg, ZA, 2198 Dec 2, 2025
Supervisor, Piping & Maintenance
Supervisor, Piping & Maintenance GN Qualified Trades
GN Dec 2, 2025
Senior Specialist, Controllership UK & Australia GB Dec 2, 2025
Superintendent, Category Management
Superintendent, Category Management Johannesburg, ZA, 2198 Category Management
Johannesburg, ZA, 2198 Dec 2, 2025
Sr. Specialist, Sr. Mine Planning Engineer - Beatty/Las Vegas, NV
Sr. Specialist, Sr. Mine Planning Engineer - Beatty/Las Vegas, NV Beatty, NV, US, 89020 Mining Technical Services
Beatty, NV, US, 89020 Nov 28, 2025
Sr. Specialist, Construction Scheduler - Beatty/Las Vegas, NV
Sr. Specialist, Construction Scheduler - Beatty/Las Vegas, NV Beatty, NV, US, 89020 Project Management
Beatty, NV, US, 89020 Nov 28, 2025
Head of Legal North America
Head of Legal North America Greenwood Village, CO, US, 80111 Legal
Greenwood Village, CO, US, 80111 Nov 28, 2025
Backfill Superintendent
Backfill Superintendent Obuasi, GH Administration
Obuasi, GH Nov 27, 2025
Manager, Project Services
Manager, Project Services Johannesburg, ZA, 2198 Project Management
Johannesburg, ZA, 2198 Nov 26, 2025

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

 

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.