Tanzania

Title Location Date Sort descending
Reset
Principal Geologist Operations
Principal Geologist Operations Accra, GH +6 more… Geosciences Systems
Accra, GH +6 more… Apr 8, 2026
Gun Handler
Gun Handler Geita, Geita, TZ Administration
Geita, Geita, TZ Apr 7, 2026
ERT Specialist
ERT Specialist Geita, Geita, TZ Emergency Services
Geita, Geita, TZ Apr 7, 2026
Graduate Engineer - UG Mine Planning
Graduate Engineer - UG Mine Planning Geita, Geita, TZ Mine Operations
Geita, Geita, TZ Apr 3, 2026
Engineer 3 LTP - UG Planning
Engineer 3 LTP - UG Planning Geita, Geita, TZ Administration
Geita, Geita, TZ Apr 3, 2026
Geologist 1 - Grade Control
Geologist 1 - Grade Control Geita, Geita, TZ Geochemistry
Geita, Geita, TZ Apr 2, 2026
Technician 2 - Survey
Technician 2 - Survey Geita, Geita, TZ Mine Geology
Geita, Geita, TZ Apr 2, 2026
Graduate Geologist 2 - Mine Geology
Graduate Geologist 2 - Mine Geology Geita, Geita, TZ Mine Geology
Geita, Geita, TZ Apr 2, 2026
Graduate Geologist 2 - Exploration
Graduate Geologist 2 - Exploration Geita, Geita, TZ Mine Geology
Geita, Geita, TZ Apr 2, 2026
Geologist 2 - Exploration
Geologist 2 - Exploration Geita, Geita, TZ Exploration
Geita, Geita, TZ Apr 2, 2026
Graduate Mine Surveyor OP
Graduate Mine Surveyor OP Geita, Geita, TZ Survey
Geita, Geita, TZ Apr 2, 2026
Geological Assistant 2 - UG Mining NY&GH
Geological Assistant 2 - UG Mining NY&GH Geita, Geita, TZ Mine Geology
Geita, Geita, TZ Apr 2, 2026
Analyst Logistics
Analyst Logistics Dar Es Salaam, Dar es Salaam, TZ +1 more… Logistics
Dar Es Salaam, Dar es Salaam, TZ +1 more… Apr 2, 2026
Geologist 1 - Grade Control
Geologist 1 - Grade Control Geita, Geita, TZ Geochemistry
Geita, Geita, TZ Apr 2, 2026
Technician 1 - Hydrogeology
Technician 1 - Hydrogeology Geita, Geita, TZ Hydrogeology
Geita, Geita, TZ Mar 25, 2026
Technician 1 - Condition Monitoring
Technician 1 - Condition Monitoring Geita, Geita, TZ Qualified Trades
Geita, Geita, TZ Mar 25, 2026
Technical Aid 3 - Carpenter
Technical Aid 3 - Carpenter Geita, Geita, TZ Qualified Trades
Geita, Geita, TZ Mar 25, 2026
Senior Officer - Product Control
Senior Officer - Product Control Geita, Geita, TZ Administration
Geita, Geita, TZ Mar 25, 2026
Technical Aid 1 - Monitoring
Technical Aid 1 - Monitoring Geita, Geita, TZ Administration
Geita, Geita, TZ Mar 23, 2026
Operator 1 - Tractor
Operator 1 - Tractor Geita, Geita, TZ Travel Management
Geita, Geita, TZ Mar 23, 2026
Senior Specialist - Open Pit Mine Planning
Senior Specialist - Open Pit Mine Planning Perth, WA, AU, 6000 +10 more… Mine Operations
Perth, WA, AU, 6000 +10 more… Mar 12, 2026

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

GEITA, TANZANIA

Geita, one of AngloGold Ashanti’s flagship mines, is located in north-western Tanzania, in the Lake Victoria goldfields of the Mwanza region, about 120km from Mwanza and 4km west of the town of Geita.

Overview and Locality

Geita Gold Mine (GGM) is wholly owned by AngloGold Ashanti and sources ore from Nyankanga open pit and from two underground mines (Star and Comet as well as Nyankanga) in 2020.

Geita has an established 5.2Mtpa CIL processing plant capable of processing hard ore. It also has an established tailings storage facility. A full workshop facility is in place to support the maintenance of heavy mining equipment and all light support equipment. Additional support infrastructure includes a mine village, medical clinic, mine store, administration buildings and airstrip. The underground mining method used at Geita is a combination of Longitudinal Open Stoping (LOS) and Transverse Open Stoping (TOS).

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.

A Brief History

In 1936, the first Geita deposits were discovered and by 1966, three mines had produced almost 1Moz of gold.

Ashanti acquired the project through acquisition of Cluff Resources in 1996 and in early December 2000, Ashanti reached an agreement to sell AngloGold a 50% interest in Geita for $324 million. AngloGold added its neighbouring Nyamulilima Hill deposits into the JV company.

  • In 2004, the merger of AngloGold and Ashanti resulted in the operation being wholly run by AngloGold Ashanti.
  • In 2015, a decision was taken to go underground at Star and Comet and the underground development started in 2016.
  • In 2017 the Nyankanga underground operation commenced and in 2020 the Geita Hill underground commenced and is scheduled to ramp up to full production by the end of 2022.

 

The Nyankanga open pit, the only remaining operating pit at the time, was mined to completion in September 2020. In April 2021, the Nyamulilima open pit commenced operations.