Colombia

Watch jobs in this category

Title Sort descending Location Date
Reset
Sr. Project Geologist, Greenfields Exploration - North America Reno, NV, US, 89511 Aug 18, 2026
Instrumentation and Controls Engineer
Instrumentation and Controls Engineer Las Vegas, NV, US, 89149 Mining Technical Services
Las Vegas, NV, US, 89149 Aug 17, 2026
Sr. Specialist, Project Controls
Sr. Specialist, Project Controls Las Vegas, NV, US, 89149 Project Management
Las Vegas, NV, US, 89149 Aug 17, 2026
Superintendent, Civil and Structural Engineer
Superintendent, Civil and Structural Engineer Las Vegas, NV, US, 89149 Project Management
Las Vegas, NV, US, 89149 Aug 17, 2026
Manager, Process Engineering
Manager, Process Engineering Tarkwa, GH Maintenance
Tarkwa, GH Aug 17, 2026
Senior Project Metallurgist
Senior Project Metallurgist Las Vegas, NV, US, 89149 Processing
Las Vegas, NV, US, 89149 Aug 15, 2026
Principal, Mining Projects
Principal, Mining Projects Obuasi, GH Project Management
Obuasi, GH Aug 14, 2026
Product Owner, SuccessFactors (Performance and Reward)
Product Owner, SuccessFactors (Performance and Reward) Greenwood Village, CO, US, 80111 HR Systems
Greenwood Village, CO, US, 80111 Aug 13, 2026
Technician Mechanical Maintenance
Technician Mechanical Maintenance Tropicana Gold Mine, WA, AU, 6430 Trades
Tropicana Gold Mine, WA, AU, 6430 Aug 12, 2026
Sr. Specialist, SAP Systems Analyst - North America
Sr. Specialist, SAP Systems Analyst - North America Las Vegas, NV, US, 89149 +1 more… SCM Strategy & Planning
Las Vegas, NV, US, 89149 +1 more… Aug 8, 2026

COLOMBIA

Greenfields Projects - AngloGold Ashanti currently has three greenfields projects in Colombia. Quebradona and Gramalote, in the department of Antioquia, are at various stages of permitting and feasibility study, and La Colosa, in the department of Tolima, is presently under force majeure.

COLOMBIA

Greenfields Projects - AngloGold Ashanti currently has three greenfields projects in Colombia. Quebradona and Gramalote, in the department of Antioquia, are at various stages of permitting and feasibility study, and La Colosa, in the department of Tolima, is presently under force majeure.

Overview and Locality

Gramalote

The Gramalote project, a joint venture between AngloGold Ashanti (50%) and B2Gold (50%), is located near the towns of Providencia and San Jose del Nus within the municipality of San Roque, in the northwest of the Department of Antioquia. It is approximately 124km northeast of Medellín, the regional capital of the Antioquia Department. B2Gold became the project manager and operator in 2020.

Work on the feasibility study continued as planned in 2020 with drilling resuming in May 2020. Feasibility stage metallurgical studies and process plant designs were also completed, while infrastructure design work continues. A revised schedule and budget for the proposed optimisations, continued sustainability projects, further exploration and completion of a final feasibility study is being developed. The final feasibility study for the project is expected to be delivered during the course of 2022.

La Colosa 

The La Colosa project is located approximately 150km west of Bogota, in the Tolima Department. It is a very large porphyry-style gold deposit discovered by AngloGold Ashanti Colombia greenfield exploration group in 2006. This wholly owned project is currently under force majeure until the necessary environmental permits are issued.

Overview and Locality

Gramalote

The Gramalote project, a joint venture between AngloGold Ashanti (50%) and B2Gold (50%), is located near the towns of Providencia and San Jose del Nus within the municipality of San Roque, in the northwest of the Department of Antioquia. It is approximately 124km northeast of Medellín, the regional capital of the Antioquia Department. B2Gold became the project manager and operator in 2020.

Work on the feasibility study continued as planned in 2020 with drilling resuming in May 2020. Feasibility stage metallurgical studies and process plant designs were also completed, while infrastructure design work continues. A revised schedule and budget for the proposed optimisations, continued sustainability projects, further exploration and completion of a final feasibility study is being developed. The final feasibility study for the project is expected to be delivered during the course of 2022.

La Colosa 

The La Colosa project is located approximately 150km west of Bogota, in the Tolima Department. It is a very large porphyry-style gold deposit discovered by AngloGold Ashanti Colombia greenfield exploration group in 2006. This wholly owned project is currently under force majeure until the necessary environmental permits are issued.

Quebradona

The Quebradona project is situated in the Middle Cáuca region of Colombia, in the Department of Antioquia, 60km southwest of Medellín within the Municipality of Jericó. The project is 100% owned and managed by AngloGold Ashanti. Quebradona remains an attractive long-life, high-grade, low-cost project which will add copper production to our portfolio. A feasibility study is underway to determine the engineering activities.

The project is expected to treat 6.2Mt annually to produce 3 billion pounds of copper, 1.5Moz of gold and 21Moz of silver over a potential 23-year life. Quebradona will be a copper mine with gold and silver as by-products. First production is expected approximately four-and-half years from the start of construction. Colombia’s environmental agency (ANLA) took the decision to archive our environmental licence application relating to Quebradona. AngloGold Ashanti has filed an appeal seeking to secure further details on the specific additional information the agency would require in order to be able to prepare a licence submission that would meet the agency’s requirements.

This process will result in a delay to the project.

Quebradona

The Quebradona project is situated in the Middle Cáuca region of Colombia, in the Department of Antioquia, 60km southwest of Medellín within the Municipality of Jericó. The project is 100% owned and managed by AngloGold Ashanti. Quebradona remains an attractive long-life, high-grade, low-cost project which will add copper production to our portfolio. A feasibility study is underway to determine the engineering activities.

The project is expected to treat 6.2Mt annually to produce 3 billion pounds of copper, 1.5Moz of gold and 21Moz of silver over a potential 23-year life. Quebradona will be a copper mine with gold and silver as by-products. First production is expected approximately four-and-half years from the start of construction. Colombia’s environmental agency (ANLA) took the decision to archive our environmental licence application relating to Quebradona. AngloGold Ashanti has filed an appeal seeking to secure further details on the specific additional information the agency would require in order to be able to prepare a licence submission that would meet the agency’s requirements.

This process will result in a delay to the project.